#08
Slab edge detail at gridline F
Assigned to EOR Structural
Open
4d open
#09
Door hardware clarification, suite 102
Assigned to Architect
Open
3d open
#10
Duct routing conflict, mech room
Assigned to MEP Engineer
Open
6d open
#11
Curtainwall anchor depth
Assigned to EOR Structural
Open
8d open
#12
Fire-rated assembly at level 2
Assigned to Architect
Open
11d open
#13
Concrete pour sequence
Assigned to EOR Structural
Closed
Closed
#14
Electrical panel schedule discrepancy
Assigned to MEP Engineer
Open
9d open
#15
Site drainage at north entry
Assigned to Civil Engineer
Open
5d open
#16
Roof drain locations
Assigned to Architect
Open
2d open
#17
Storefront mullion finish
Assigned to Architect
Open
16d open